16 bathroom update.

3.15.2012

I haven't really talked about the master bathroom renovation much lately. It's still coming along, rather slowly. Adam primarily only works on it during the weekends, which makes progress seem to crawl, but we are beginning to see it come together now. The floor tile is nearly finished, we're just waiting on our last bag of grout (we ran out and it has to be special ordered) so we can finish the shower floor, along with adding a few tile pieces along the edge of the bench that fell out and the tiling the edges of the cubbies.


 I am completely smitten with our herringbone floors!

All that's left is wall tile installation and grout, paint, board and batten, bringing in the fixtures, and decorating!  Okay, so I realize that's a lot, but the end is getting closer.

16 comments:

  1. Wow, that looks fantastic! I am smitten, too. How long did it take to lay/cut that tile?

    ReplyDelete
  2. Oooh, I'd be smitten with that tile too! Looks great so far!

    ReplyDelete
  3. Wow, Holly what fancy shower! That tile is gorgeous.

    ReplyDelete
  4. pretty incredible! well done! want to come to dc and do mine?

    ReplyDelete
  5. I would be smitten too if I got to look at that floor everyday. So beautiful!!

    ReplyDelete
  6. I LOVE this!! I just fixed a hole in my shower wall and I wish I was just remodeling the whole thing. I hope to see pictures of the finished product!

    ReplyDelete
  7. It's just lovely! We've done a bathroom remodel, there may be a lot left but I think the tiling is the hardest/most time consuming part. Everything else will fall right into place!!

    ReplyDelete
  8. That herringbone tile was absolutely the perfect choice! Your bathroom is already looking beautiful. When the whole thing is done it will be well worth the work and wait. :)

    ReplyDelete
  9. I cannot get over how much I love your tile. How big is each herringbone segment? LOVE this....

    ReplyDelete

Related Posts with Thumbnails
 

Blogging tips